Advanced Transportation Solutions (ATS/American) http://www.ats-american.com Transportation engineering consulting firm serving clients both locally and nationally Tue, 27 Feb 2018 19:05:43 +0000 en-US hourly 1 I-75/SR 56 Interchange from East of CR 54 to West of Cypress Ridge Boulevard http://www.ats-american.com/innovative-designs/diverging-diamond-interchange/i-75sr-56-interchange-east-cr-54-west-cypress-ridge-boulevard/ Thu, 11 Aug 2016 20:33:03 +0000 http://www.ats-american.com/?p=714 {…}]]> The purpose of this project is to reconstruct the existing I-75 at SR 56 diamond interchange to a diverging diamond interchange (DDI). Specific improvements include modifying lane configurations to improve capacity, geometric refinements along SR 56 and the I-75 ramps to accommodate the DDI configuration, and improved bicycle and pedestrian facilities within the project limits. All improvements will be designed within the existing right-of-way while maintaining the existing SR 56 over I-75 bridge width and cross slope. The drainage improvements will consist of a closed drainage system, median swales, nutrient treatment, modifications to existing ponds, and potential regional/joint use ponds. Permits are expected from the United States Army Corps of Engineers, the Southwest Florida Water Management District, and the Florida Department of Environmental Protection.

I-75/SR 56 Interchange from East of CR 54 to West of Cypress Ridge Boulevard I-75/SR 56 Interchange from East of CR 54 to West of Cypress Ridge Boulevard ]]>
Senior Traffic Engineer http://www.ats-american.com/careers/senior-traffic-engineer/ Wed, 01 Oct 2014 18:22:30 +0000 http://www.ats-american.com/?p=697 ATS is looking for a highly motivated individual to join us in Maryland in our traffic division. Consider your future with us at ATS.

]]>
Traffic Engineer http://www.ats-american.com/careers/traffic-engineer/ Wed, 01 Oct 2014 18:19:10 +0000 http://www.ats-american.com/?p=694 ATS is looking for a highly motivated individual to join us in Maryland in our traffic division. Consider your future with us at ATS.

]]>
I-75 and SR 884 (Colonial Boulevard) Interchange http://www.ats-american.com/innovative-designs/superstreet/i-75-sr-884-colonial-boulevard-interchange-3/ Mon, 25 Aug 2014 15:12:36 +0000 http://www.ats-american.com/?p=673 {…}]]> The interchange of I-75 and Colonial Boulevard needs to be improved to accommodate future traffic growth due to development in the vicinity of the interchange and is anticipated to enhance overall safety, capacity, and emergency evacuation within the county.

The purpose of the study is to re-evaluate the original preferred alternative, a Single Point Urban Interchange (SPUI), for improved operations to meet future traffic needs. In 2011, FDOT widened I-75 to six lanes and widened the existing bridges over Colonial Boulevard. Furthermore, Lee County widened Colonial Boulevard to six lanes in 2012. Implementing a SPUI would require replacement of the I-75 bridges over Colonial Boulevard. In order to salvage the newly widened I-75 bridges, FHWA suggested to FDOT a reassessment of the interchange. American completed the re-evaluation and determined that a Diverging Diamond Interchange (DDI) Configuration with Continuous Flow Intersection (CFI) at Ortiz Avenue and Superstreet at Forum Boulevard is the best solution for this location. Design will begin in late 2014.

The DDI interchange alternative salvages the bridges, eliminates on and off-ramp conflicts with through lanes, and improves signal spacing.

A CFI was developed for the Ortiz Avenue intersection. A CFI is a unique design where some or all of the left turn movements begin before crossing the intersection. The major advantage of the CFI is left turning traffic can be eliminated as a critical movement for the signal timing. This is especially useful for the Ortiz Avenue intersection, where the AM peak for the design year is projected to be more than 1,300 left turning vehicles from westbound Colonial Boulevard to southbound Ortiz Avenue. Another advantage is fewer signal phases, which can reduce the cycle length and allow more green time for the through movements.

A Superstreet was developed for the Forum Boulevard intersection. A Superstreet is an innovative intersection design that reduces signal phases and improves traffic flow for the major direction. In a Superstreet, the major roadway, in this case Colonial Boulevard, is allowed to make all the movements directly at the minor roadway, in this case Forum Boulevard. However, from the minor roadway, traffic will be forced to make a right turn onto the major roadway with no direct through or left turn movements allowed. To complete those movements, traffic will need to make a U-turn at a median opening east and west of the intersection and then return to the minor roadway intersection to complete the desired movement. All movements are signalized in the Superstreet. Operationally, there are two major advantages of the Superstreet. First, all traffic signals have just two phases. This allows a higher percentage of green time for each phase as well as a reduction of the overall cycle length. The second advantage is that signals in the eastbound direction are independent from signals in the westbound direction. This results in each direction acting as one-way streets that can have “perfect” signal progression.

The advantages of having a CFI and Superstreet on the opposite sides of the DDI include reduction of signal phases at each intersection, resulting in a shorter cycle length. The one-way roadway characteristics of the Superstreet also complement the one-way roadway characteristics of the DDI. This allows for the maximum green bandwidth possible between all intersections in each direction.

I-75 and SR 884 (Colonial Boulevard) Interchange ]]>
I-75 and SR 884 (Colonial Boulevard) Interchange http://www.ats-american.com/innovative-designs/continuous-flow-intersection/i-75-sr-884-colonial-boulevard-interchange-2/ Mon, 25 Aug 2014 15:10:24 +0000 http://www.ats-american.com/?p=671 {…}]]> The interchange of I-75 and Colonial Boulevard needs to be improved to accommodate future traffic growth due to development in the vicinity of the interchange and is anticipated to enhance overall safety, capacity, and emergency evacuation within the county.

The purpose of the study is to re-evaluate the original preferred alternative, a Single Point Urban Interchange (SPUI), for improved operations to meet future traffic needs. In 2011, FDOT widened I-75 to six lanes and widened the existing bridges over Colonial Boulevard. Furthermore, Lee County widened Colonial Boulevard to six lanes in 2012. Implementing a SPUI would require replacement of the I-75 bridges over Colonial Boulevard. In order to salvage the newly widened I-75 bridges, FHWA suggested to FDOT a reassessment of the interchange. American completed the re-evaluation and determined that a Diverging Diamond Interchange (DDI) Configuration with Continuous Flow Intersection (CFI) at Ortiz Avenue and Superstreet at Forum Boulevard is the best solution for this location. Design will begin in late 2014.

The DDI interchange alternative salvages the bridges, eliminates on and off-ramp conflicts with through lanes, and improves signal spacing.

A CFI was developed for the Ortiz Avenue intersection. A CFI is a unique design where some or all of the left turn movements begin before crossing the intersection. The major advantage of the CFI is left turning traffic can be eliminated as a critical movement for the signal timing. This is especially useful for the Ortiz Avenue intersection, where the AM peak for the design year is projected to be more than 1,300 left turning vehicles from westbound Colonial Boulevard to southbound Ortiz Avenue. Another advantage is fewer signal phases, which can reduce the cycle length and allow more green time for the through movements.

A Superstreet was developed for the Forum Boulevard intersection. A Superstreet is an innovative intersection design that reduces signal phases and improves traffic flow for the major direction. In a Superstreet, the major roadway, in this case Colonial Boulevard, is allowed to make all the movements directly at the minor roadway, in this case Forum Boulevard. However, from the minor roadway, traffic will be forced to make a right turn onto the major roadway with no direct through or left turn movements allowed. To complete those movements, traffic will need to make a U-turn at a median opening east and west of the intersection and then return to the minor roadway intersection to complete the desired movement. All movements are signalized in the Superstreet. Operationally, there are two major advantages of the Superstreet. First, all traffic signals have just two phases. This allows a higher percentage of green time for each phase as well as a reduction of the overall cycle length. The second advantage is that signals in the eastbound direction are independent from signals in the westbound direction. This results in each direction acting as one-way streets that can have “perfect” signal progression.

The advantages of having a CFI and Superstreet on the opposite sides of the DDI include reduction of signal phases at each intersection, resulting in a shorter cycle length. The one-way roadway characteristics of the Superstreet also complement the one-way roadway characteristics of the DDI. This allows for the maximum green bandwidth possible between all intersections in each direction.

I-75 and SR 884 (Colonial Boulevard) Interchange ]]>
I-75 and SR 884 (Colonial Boulevard) Interchange http://www.ats-american.com/innovative-designs/diverging-diamond-interchange/i-75-sr-884-colonial-boulevard-interchange/ Mon, 25 Aug 2014 14:36:49 +0000 http://www.ats-american.com/?p=669 {…}]]> The interchange of I-75 and Colonial Boulevard needs to be improved to accommodate future traffic growth due to development in the vicinity of the interchange and is anticipated to enhance overall safety, capacity, and emergency evacuation within the county.

The purpose of the study is to re-evaluate the original preferred alternative, a Single Point Urban Interchange (SPUI), for improved operations to meet future traffic needs. In 2011, FDOT widened I-75 to six lanes and widened the existing bridges over Colonial Boulevard. Furthermore, Lee County widened Colonial Boulevard to six lanes in 2012. Implementing a SPUI would require replacement of the I-75 bridges over Colonial Boulevard. In order to salvage the newly widened I-75 bridges, FHWA suggested to FDOT a reassessment of the interchange. American completed the re-evaluation and determined that a Diverging Diamond Interchange (DDI) Configuration with Continuous Flow Intersection (CFI) at Ortiz Avenue and Superstreet at Forum Boulevard is the best solution for this location. Design will begin in late 2014.

The DDI interchange alternative salvages the bridges, eliminates on and off-ramp conflicts with through lanes, and improves signal spacing.

A CFI was developed for the Ortiz Avenue intersection. A CFI is a unique design where some or all of the left turn movements begin before crossing the intersection. The major advantage of the CFI is left turning traffic can be eliminated as a critical movement for the signal timing. This is especially useful for the Ortiz Avenue intersection, where the AM peak for the design year is projected to be more than 1,300 left turning vehicles from westbound Colonial Boulevard to southbound Ortiz Avenue. Another advantage is fewer signal phases, which can reduce the cycle length and allow more green time for the through movements.

A Superstreet was developed for the Forum Boulevard intersection. A Superstreet is an innovative intersection design that reduces signal phases and improves traffic flow for the major direction. In a Superstreet, the major roadway, in this case Colonial Boulevard, is allowed to make all the movements directly at the minor roadway, in this case Forum Boulevard. However, from the minor roadway, traffic will be forced to make a right turn onto the major roadway with no direct through or left turn movements allowed. To complete those movements, traffic will need to make a U-turn at a median opening east and west of the intersection and then return to the minor roadway intersection to complete the desired movement. All movements are signalized in the Superstreet. Operationally, there are two major advantages of the Superstreet. First, all traffic signals have just two phases. This allows a higher percentage of green time for each phase as well as a reduction of the overall cycle length. The second advantage is that signals in the eastbound direction are independent from signals in the westbound direction. This results in each direction acting as one-way streets that can have “perfect” signal progression.

The advantages of having a CFI and Superstreet on the opposite sides of the DDI include reduction of signal phases at each intersection, resulting in a shorter cycle length. The one-way roadway characteristics of the Superstreet also complement the one-way roadway characteristics of the DDI. This allows for the maximum green bandwidth possible between all intersections in each direction.

I-75 and SR 884 (Colonial Boulevard) Interchange ]]>
I-75 at SR 72 (Clark Road) Interchange http://www.ats-american.com/innovative-designs/diverging-diamond-interchange/i-75-sr-72-clark-road-interchange/ Wed, 06 Aug 2014 18:11:03 +0000 http://www.ats-american.com/?p=654 {…}]]> The purpose of this project is to reconstruct the existing I-75 at Clark Road interchange facility to the ultimate configuration as defined in the Project Development and Environment Study (PD&E). The interchange will be reconstructed as a Diverging Diamond Interchange (DDI). The interchange improvements will also require the replacement of the existing I-75 at SR 72 (Clark Road) bridges. I-75 will be constructed to accommodate the ultimate typical section of a ten-lane facility with two express lanes and three general use lanes in each direction. North of Clark Road, an auxiliary lane will be added in both directions along I-75. The drainage improvements will be open ditches, ponds, and floodplain compensation. Permits are expected from the United States Army Corps of Engineers, the Southwest Florida Water Management District, and the Florida Department of Environmental Protection.

I-75 at SR 72 (Clark Road) Interchange I-75 at SR 72 (Clark Road) Interchange I-75 at SR 72 (Clark Road) Interchange I-75 at SR 72 (Clark Road) Interchange ]]>
Philippe Parkway / 1st Avenue North/Church Street Roundabout http://www.ats-american.com/innovative-designs/roundabout/philippe-parkway-1st-avenue-northchurch-street-roundabout/ Wed, 23 Jul 2014 19:49:32 +0000 http://www.ats-american.com/newsite/?p=637 {…}]]> Provided conceptual design of a two-lane four-leg roundabout intersecting Philippe Parkway at the mainline with Church Street and 1st Avenue North as the secondary legs. The configuration for capacity consideration were two-lane roadway legs with single lane entries/exits with a single circulatory roadway. Due to the extreme skew angle with Church Street and Philippe Parkway the roundabout was designed with a larger inscribed circle diameter and a wide traversable apron on the central island to accommodate trucks. Philippe Parkway / 1st Avenue North/Church Street Roundabout

]]>
9th Avenue at Langley Avenue and Tippin Avenue Intersection Improvements Roundabout http://www.ats-american.com/innovative-designs/roundabout/9th-avenue-langley-avenue-tippin-avenue-intersection-improvements-roundabout/ Wed, 23 Jul 2014 19:46:10 +0000 http://www.ats-american.com/newsite/?p=635 {…}]]> Provided conceptual design of a roundabout at the intersection of 9th at Langley Avenue and Tippin Avenue. The two-lane four-leg roundabout alternative was considered as an improvement option to alleviate congestion at this intersection.

]]>
SR 70 at US 441 Intersection Roundabout http://www.ats-american.com/innovative-designs/roundabout/sr-70-441-intersection-roundabout/ Wed, 23 Jul 2014 19:43:50 +0000 http://www.ats-american.com/newsite/?p=633 {…}]]> Provided conceptual design of a four-leg roundabout to allow for two through movements in each direction. Dual left-turns and a six-foot raised separator for all four legs of the intersection were designed.

]]>