Client: Detroit International Bridge Company
Location: Detroit, Michigan
Completion Date: Ongoing
Providing design for a roundabout on the mainland to tie the proposed bridge into M-29. All traffic using M-29 will also use this roundabout. An analysis was also conducted in conjunction with MDOT to study the feasibility of a roundabout at the intersection of M-29 and Island Drive. Based on the results from this study, single-lane roundabout would operate effectively given the current conceptual design of the roundabout.